The project combined core repair work with practical finish upgrades throughout the property, helping create
a cleaner, more polished home while addressing important maintenance items inside and out.
Completed full clean-up and hauling, including removal of leftover items and debris plus cleaning floors, walls, windows, and other surfaces.
Performed electrical inspection work and installed outlets in the new 4th bedroom to improve functionality and usability.
Completed plumbing inspection and repair work along with general carpentry and drywall repairs across the home.
Added one new window to the 4th bedroom to improve light, ventilation, and overall room finish.
Painted walls, ceilings, baseboards, and trim for a cleaner, refreshed interior presentation.
Serviced HVAC components, cleaned the furnace, installed a cold air filter vent, replaced the furnace gas shut-off valve, and added drip legs on gas lines.
Leveled floors and installed vinyl plank flooring in the bedroom and laundry room, with vinyl laminate flooring in the front room and hallway.
Replaced hardware, added window blinds and smoke detectors, filled garage floor cracks, power washed the exterior, repaired sidewalk concrete, and completed landscaping with tree trimming.